Wednesday, 9 April 2008

In Sector 1 was getting used to digging out the foundation, placing the hardcore laying the track. Running the train and digging proved too much for me with nervous energy diverted in too many directions. Now the soil is dug out and pilled up and then moved by train.














 In Sector 2 I have improved the design of the drive railway interface - the key desig feature is the edging for the block paving. The brack through is seperate edging blocks to constrain the block paving - these are block paving on their end. Additional blocks to support the wooden decking - as the support is for both foot and car traffic a double row of blocks has been used and therefore slightly longer wood as been required.



Progress is now being made in sector 3 with reuse of the 1/8 circle temporary piece of track to enable the picking up of the spare soil.


I enjoy digging the foundations, moving the the hardcore into place, placing the track, running the train.